Projects:

Slope reinforcement in the waste disposal site Ahrental (Tyrol, Austria)

Construction of a slope reinforcement on a 380 m long und up to 29 m high road cut (anchorwall with pre-stressed anchors etc.)

_________________________________________________________________________________________

Rock slope protection L62 Metnitztal Straße (Austria)

Geotechnical expertise and planning of a slope protection system for a approximately 500 m long slope along the rural road L62 Metnitztalstraße

_________________________________________________________________________________________

Rockfall at the B99 Katschbergstrasse (Austria)

Rehabilitation of a 300 m long slope after a severe rockfall at the B99 Katschbergstraße (Austria) 

_________________________________________________________________________________________

 

Further projects:

Site investigation, laboratory tests, geotechnical expertise, geotechnical monitoring, stability analysis, tender work, geotechnical consultancy during construction

Reinforcement of slopes and cuts (soils and rocks), landslides, rockfalls etc.

  • Slope stabilization Böhler Kapfenberg, Austria (2008)
  • Enlargement of the hotel Scalaria Wolfgangsee, Austria (2008-2009)
  • Rock slope protection Schwanberg, Schwarze Sulm/Stmk, construction of a new gas pipeline, Austria (2005-2006)
  • Rock slope protection Hotel Marietta Obertauern, Austria (2004)
  • B90 - double hairpin bend - Naßfeld, Austria (2004)
  • A2 Südautobahn Objekt G22a - Hangbrücke Laßnitzhöhe, Austria (2004)
  • B111 Gredachbachbrücke, Lesachtal, Austria (2001)
  • Erzherzog-Johann-Hütte, Großglockner (2000/01)